top of page
Minimalist Modern
H-Line Handleless; Sutton Silk in Scots Grey with Ligna in Mayfield Oak.
This stunning transformational project was completed in March 2020 for a customer in Little Billing, Northampton.
![DSC_0378-1.JPG](https://static.wixstatic.com/media/1514b3_6f5c52afde7340b7a68d398915687f90~mv2.jpg/v1/fill/w_95,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_6f5c52afde7340b7a68d398915687f90~mv2.jpg)
![DSC_0425.JPG](https://static.wixstatic.com/media/1514b3_010475a2dfc848279dd556c0a54f8a75~mv2.jpg/v1/fill/w_64,h_96,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_010475a2dfc848279dd556c0a54f8a75~mv2.jpg)
![Wilk-768x1024.jpg](https://static.wixstatic.com/media/1514b3_9afe36b3ccd04accb9b21ed052f86037~mv2.jpg/v1/fill/w_72,h_96,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_9afe36b3ccd04accb9b21ed052f86037~mv2.jpg)
![DSC_0500.JPG](https://static.wixstatic.com/media/1514b3_c33c628313304e3ab2ef05a81d54ac0b~mv2.jpg/v1/fill/w_64,h_96,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_c33c628313304e3ab2ef05a81d54ac0b~mv2.jpg)
![DSC_0486.JPG](https://static.wixstatic.com/media/1514b3_0ea7490ee6a74a4ab9514118fe0312db~mv2.jpg/v1/fill/w_56,h_84,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_0ea7490ee6a74a4ab9514118fe0312db~mv2.jpg)
![DSC_0396.JPG](https://static.wixstatic.com/media/1514b3_43e6f0ad9e84449b9eaa29f4a4e2c7cd~mv2.jpg/v1/fill/w_56,h_84,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_43e6f0ad9e84449b9eaa29f4a4e2c7cd~mv2.jpg)
![DSC_0492.JPG](https://static.wixstatic.com/media/1514b3_a21a95f698ea479095f0d8e8c36ad318~mv2.jpg/v1/fill/w_56,h_84,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_a21a95f698ea479095f0d8e8c36ad318~mv2.jpg)
![DSC_0413.JPG](https://static.wixstatic.com/media/1514b3_ea4423f3294f48c1bdf399832dfabfd8~mv2.jpg/v1/fill/w_56,h_84,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1514b3_ea4423f3294f48c1bdf399832dfabfd8~mv2.jpg)
This project included internal structural alterations – the removal of an internal load-bearing wall – and removal of all fixtures and fittings in the kitchen, dining room, conservatory and entrance hall, to completely rework and maximise the available space.
During this project we re-plastered all walls, replaced the electrical consumer unit, provided kitchen plumbing solutions and also installed a Herschel ceramic heater in the conservatory.
Our customer chose stylish Karndean vinyl flooring, laid in a herringbone pattern throughout for a modern and seamless look.
The kitchen is by Masterclass Kitchens and all appliances are by Neff.
The project lasted 9 weeks, and was delivered on time and budget for a delighted customer who enjoys the timeless minimal look of this stunning and multi-functional kitchen.
bottom of page